It will take over a year to replace the bridge? That is a major bummer, as I almost always swing through the NWR on my way to visit relatives in Vancouver, WA. Many of these trips are on a week day.
The bridge appeared to be in much better shape than the dirt road leading down the hill to the bridge.
Bill Anderson; Edmonds, WA. USA
On Thursday, February 28, 2019, 11:00:51 AM PST, Randy <
re_hill at q.com> wrote:
I was just informed that public use entry to the River S Unit of Ridgefield NWR will be closed weekdays (M-F) beginning March 18 as construction begins to replace the existing 1-lane bridge crossing Lake River. This project could last into the summer of 2020. Weekend access will remain open.
Randy Hill
Ridgefield
_______________________________________________
Tweeters mailing list
Tweeters at u.washington.edu
http://mailman11.u.washington.edu/mailman/listinfo/tweeters
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <
http://mailman11.u.washington.edu/pipermail/tweeters/attachments/20190228/efaaf891/attachment.html>